Acciona
El Romero PV Plant
Atacama Desert
The largest photovoltaic plant in Latin America, supplying 240,000 homes.
- MW
- 246
- hectares
- 262
Thermography at a photovoltaic plant
Plants, locations and areas measured. The figures are the ones published for each project.






Acciona
Atacama Desert
The largest photovoltaic plant in Latin America, supplying 240,000 homes.
Thermography at a photovoltaic plant
Acciona
Diego de Almagro, Atacama Region
Supplies 280,000 homes and cuts 512,000 tonnes of CO2 a year.
Thermography at a photovoltaic plant
Colbún
Diego de Almagro, Atacama Region
Second consecutive year working on this solar park.
Thermal inspection at a photovoltaic plant
Enel
María Elena, Antofagasta Region
Generates more than 400 GWh a year.
Thermography at a photovoltaic plant
Enel
Taltal, Antofagasta Region
258 thousand panels, enough to supply roughly 100,000 homes.
Thermal inspection at a photovoltaic plant
Enel
Taltal, Antofagasta Region
Generates 160 GWh a year, power for roughly 90,000 homes.
Thermography at a photovoltaic plant
Acciona
Calama, Antofagasta Region
Acciona's third largest photovoltaic plant, with 187,200 modules.
Thermography at a photovoltaic plant
Acciona
Diego de Almagro, Atacama Region
187,620 modules installed, fourth consecutive year of collaboration.
Thermography at a photovoltaic plant
Colbún
Tiltil, Metropolitan Region
Located 15 kilometres east of Tiltil.
Thermal inspection at a photovoltaic plant
Colbún
Colbún, Maule Region
Plant located 6 kilometres from the town of Colbún.
Thermography at a photovoltaic plant
Enel Green Power
La Higuera, Coquimbo Region
This installation runs 3 different types of photovoltaic module.
Thermography at a photovoltaic plant
Minera Guanaco
Taltal, Antofagasta Region
Gold and silver mining operator, 220 km southeast of Antofagasta.
Surveying and aerial photogrammetry
Antofagasta Minerals
Antofagasta
Exploration project with 520 hectares mapped.
Aerial photogrammetric survey
SQM
María Elena, Antofagasta Region
Global leader in potassium nitrate production, 205 km from Antofagasta.
Aerial photogrammetric survey
Guanaco Compañía Minera
Taltal, Antofagasta Region
Vulnerability assessment of access points and gaps in the perimeter fence.
3D modelling
Grupo Norte Áridos
Antofagasta
Aggregates operator 40 km southeast of Antofagasta.
Surveying and stockpile volume measurement
Megatraction
Calama, Antofagasta Region
3D model of the largest bucket-wheel excavator in South America, in an open pit.
3D modelling
Guanaco Compañía Minera
Taltal, Antofagasta Region
Assessment of electrical infrastructure across 34 km² of coverage.
Power line inspection
Minera Valle Central
Requínoa, O'Higgins Region
Operation processing 135,000 tonnes of fresh tailings a day.
Power line inspection
We review the case and send a technical and commercial proposal. If the operation calls for it, we arrange a site visit.